Continuous electric energy supply to our consumers is our priority
Project goal
The goal of the project is to provide security and lessen the risk of failure of electrical energy. The project will provide mobile electrical equipment – mobile transformer stations and systems of remote control for the operators of the systems of distribution, which will enable the EPS to maintain the stability of the distribution system.
The project consists of delivering the following equipment: mobile transformer stations 110/35kV, three mobile transformer stations 35/10kV and the remote surveillance system and the control of the distribution network of middle voltage on the territory of Elektrosrbija Kraljevo (in several different branches).
- Sector
-
- Transport
- EuropeAid reference
- EuropeAid/137100/DH/SUP/RS
- Components
-
- Mobile electrical substation 110/35kV, 20MVA (LOT1)
- Three (3) mobile transformer substations 35/10kV, 8MVA (LOT2)
- Remote monitoring and control system for medium voltage distribution grid in the area of Elektrosrbija Kraljevo (LOT3)
- City / District
- Serbia: (Belgrade, Nis, Kragujevac, Kraljevo and west Serbia: Loznica, Mali Zvornik, Ljubovija, Krupanj, Cuprija, Despotovac, Svilajnac, Uzice, Cajetina, Cacak, Gornji Milanovac, Kraljevo, Vrnjacka Banja, Raska, Krusevac i Aleksandrovac)
- EU Contribution
- 8,940,765 €
- Implementation period
- December 2017 - January 2021
- Beneficiary
- Elektroprivreda Srbije
- Implemented by
- ABB Serbia; Consortium: GAT Novi Sad, Inesing S.p.a Italy, Saturn Electric Belgrade; Consortium: Institute "MIhajlo Pupin", Netico Solution Nis, Institute "Nikola Tesla" Belgrade, Elektromontaža Kraljevo, Prointer Belgrade; GOPA - intec GmbH, Germany